Resource Constrained Scheduling within Fixed Project Durations
作者:
Y.R. K,
WillisR. J.,
期刊:
Journal of the Operational Research Society
(Taylor Available online 1993)
卷期:
Volume 44,
issue 1
页码: 71-80
ISSN:0160-5682
年代: 1993
DOI:10.1057/jors.1993.8
出版商: Taylor&Francis
关键词: Resource;Scheduling;Costing
数据来源: Taylor
摘要:
AbstractThis paper presents a practical approach for resource constrained scheduling within a given project duration. The method ensures a stable project plan when activity durations are reduced to achieve this. It handles all four categories of resource (unconstrained, renewable, non-renewable and doubly-constrained resources), and aims to shorten the project duration at minimum cost. Soft constraints and resource availabilities which vary over time are allowed in the method. Computational experience is reported.