Integrative Cycle Scheduling Approach for a Capacitated Flexible Assembly System*
作者:
DaeSoo Kim,
Vincent A. Mabert,
Peter A. Pinto,
期刊:
Decision Sciences
(WILEY Available online 1993)
卷期:
Volume 24,
issue 1
页码: 126-147
ISSN:0011-7315
年代: 1993
DOI:10.1111/j.1540-5915.1993.tb00466.x
出版商: Blackwell Publishing Ltd
关键词: Heuristics;Inventory Management;Scheduling;and Simulation
数据来源: WILEY
摘要:
ABSTRACTThis study revisits the traditional single stage, multi‐item, capacitated lot‐sizing problem (CLSP) with a new integrative focus on problem structuring. Unlike past research, we develop integrative cycle scheduling approaches which simultaneously address lot‐sizing, capacity, and sequencing issues. Our purposes are to (1) explore the effect of sequencing on inventory levels, (2) examine the problem of infeasibility in the economic lot scheduling problem (ELSP), and (3) provide a simple methodology of generating low‐cost cycle schedules in an environment with discrete shipping, dynamic demands, limited capacity, zero setup cost, and sequence‐independent setup times. Our procedures are compared to benchmark cycle scheduling approaches in terms of both inventory cost and computation time under different demand scenarios, using the operating data from a flexible assembly system (FAS) at the Ford Motor Company's Sandusky, O
点击下载:
PDF
(1115KB)
返 回