首页   按字顺浏览 期刊浏览 卷期浏览 Integrative Cycle Scheduling Approach for a Capacitated Flexible Assembly System*
Integrative Cycle Scheduling Approach for a Capacitated Flexible Assembly System*

 

作者: DaeSoo Kim,   Vincent A. Mabert,   Peter A. Pinto,  

 

期刊: Decision Sciences  (WILEY Available online 1993)
卷期: Volume 24, issue 1  

页码: 126-147

 

ISSN:0011-7315

 

年代: 1993

 

DOI:10.1111/j.1540-5915.1993.tb00466.x

 

出版商: Blackwell Publishing Ltd

 

关键词: Heuristics;Inventory Management;Scheduling;and Simulation

 

数据来源: WILEY

 

摘要:

ABSTRACTThis study revisits the traditional single stage, multi‐item, capacitated lot‐sizing problem (CLSP) with a new integrative focus on problem structuring. Unlike past research, we develop integrative cycle scheduling approaches which simultaneously address lot‐sizing, capacity, and sequencing issues. Our purposes are to (1) explore the effect of sequencing on inventory levels, (2) examine the problem of infeasibility in the economic lot scheduling problem (ELSP), and (3) provide a simple methodology of generating low‐cost cycle schedules in an environment with discrete shipping, dynamic demands, limited capacity, zero setup cost, and sequence‐independent setup times. Our procedures are compared to benchmark cycle scheduling approaches in terms of both inventory cost and computation time under different demand scenarios, using the operating data from a flexible assembly system (FAS) at the Ford Motor Company's Sandusky, O

 

点击下载:  PDF (1115KB)



返 回