首页   按字顺浏览 期刊浏览 卷期浏览 Status of the first batch of niobium resonator production for the New Delhi booster lin...
Status of the first batch of niobium resonator production for the New Delhi booster linac

 

作者: Prakash N. Potukuchi,   Subhendu Ghosh,   K. W. Shepard,  

 

期刊: AIP Conference Proceedings  (AIP Available online 1999)
卷期: Volume 473, issue 1  

页码: 236-243

 

ISSN:0094-243X

 

年代: 1999

 

DOI:10.1063/1.58984

 

出版商: AIP

 

数据来源: AIP

 

摘要:

This paper reports the status and details of the costs of construction of niobium superconducting resonant cavities for a linear accelerator, presently being built as a booster for the 15 UD tandem Pelletron accelerator at the Nuclear Science Centre, New Delhi. The linear accelerator will have three cryostal modules, each holding eight quarter-wave resonators. Construction of a batch of ten resonators for the linac started at Argonne National Laboratory in May 1997. For production, all fabrication and all electron beam welding is being done through commercial vendors. Details of construction and present status of the project are presented. ©1999 American Institute of Physics.

 

点击下载:  PDF (994KB)



返 回