Load dispatching and the reasons for it, with special reference to the British grid system
作者:
A.R.Cooper,
期刊:
Journal of the Institution of Electrical Engineers - Part II: Power Engineering
(IET Available online 1948)
卷期:
Volume 95,
issue 48
页码: 713-723
年代: 1948
DOI:10.1049/ji-2.1948.0200
出版商: IEE
数据来源: IET
摘要:
The paper describes some of the problems which arise in providing for security of supplies and economical operation on the British Grid system. Under these two headings separate consideration is given to long-term and short-term planning.Long-term planning of the system determines what generating plant and transmission equipment will be provided, and the paper indicates the extent to which actual plant/load conditions have varied from those which were planned three years previously.Short-term planning is concerned with the operation of the system as it exists and a description is given of a typical day's operation of the British Grid system. Reference is also made to the operation of the system during the 1947 fuel crisis and to other operating conditions of special interest.Probable future developments associated with load dispatching are mentioned and special attention is drawn to the financial savings which could be obtained by providing better availability on high-merit plant.
点击下载:
PDF
(1590KB)
返 回