This paper describes the use of gasoline‐powered DC arc welders, rated at at least 450 A continuous duty, for thawing of frozen pipes in Madison, Wisconsin during the winter of 1976‐1977. Equipment, procedures, and time factors are discussed, and the need for proper training and safety practices is emphasized.