首页   按字顺浏览 期刊浏览 卷期浏览 A Cutting Stock and Scheduling Problem in the Copper Industry
A Cutting Stock and Scheduling Problem in the Copper Industry

 

作者: HendryL. C.,   FokK. K.,   ShekK. W.,  

 

期刊: Journal of the Operational Research Society  (Taylor Available online 1996)
卷期: Volume 47, issue 1  

页码: 38-47

 

ISSN:0160-5682

 

年代: 1996

 

DOI:10.1057/jors.1996.4

 

出版商: Taylor&Francis

 

关键词: cutting stock problem;heuristics;integer programming;production;scheduling

 

数据来源: Taylor

 

摘要:

AbstractThis case study was carried out for Thomas Bolton Ltd, a copper component manufacturer. The focus was on the first major production operation that is carried out in the foundry. This operation consists of three processes—melting scrap metal, casting it as‘logs’and cutting logs into‘billets’. The timely production of the billets is essential as these feed a bottleneck process. The objective of the study was to investigate alternative methods of generating a production plan for the foundry that minimized costs whilst meeting the demand for billets at the bottleneck. The production plan was required to include a daily production schedule and a list of the cutting patterns to use when cutting the logs into billets. Thus, both the scheduling and cutting stock problems were addressed. A two-stage solution procedure was proposed. Alternative heuristic methods were investigated at the first stage and an optimal solution using Integer Programming (IP) was proposed for the second stage. It is shown that current performance could be improved using all of the heuristics considered at the first stage, but that using an IP-based heuristic method gives the best results.

 

点击下载:  PDF (4783KB)