AN EFFICIENT APPROACH TO PRIORITIZE PROJECTS UNDER BUDGET CONSTRAINTS
作者:
CHIU-CHI WEI,
CHIE-BEIN CHEN,
CHIH-HUNG TSAI,
期刊:
The Engineering Economist
(Taylor Available online 1999)
卷期:
Volume 44,
issue 3
页码: 261-275
ISSN:0013-791X
年代: 1999
DOI:10.1080/00137919908967523
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
This paper proposes a new heuristic algorithm for solving the project selection problem. A revised decision criterion in conjunction with the techniques of searching the feasible range and the reduced candidate set is applied to improve the heuristic solution and to minimize the computational efforts. Six hard cases are tested using the presented algorithm and two other methods. Results show that the approach used in this study excels previous works in producing a small feasible range and in dealing with the abnormal data set.
点击下载:
PDF (445KB)
返 回