首页   按字顺浏览 期刊浏览 卷期浏览 The radioactive ion beams facility project for the legnaro laboratories
The radioactive ion beams facility project for the legnaro laboratories

 

作者: Luigi B. Tecchio,  

 

期刊: AIP Conference Proceedings  (AIP Available online 1999)
卷期: Volume 473, issue 1  

页码: 559-565

 

ISSN:0094-243X

 

年代: 1999

 

DOI:10.1063/1.58998

 

出版商: AIP

 

数据来源: AIP

 

摘要:

In the frame work of the Italian participation to the project of a high intensity proton facility for the energy amplifier and nuclear waste transmutations, LNL is involving in the design and construction of prototypes of the injection system of the 1 GeV linac that consists of a RFQ (5 MeV, 30 mA) followed by a 100 MeV linac. This program has been already financially supported and the work is actually in progress. In this context, the LNL has been proposed a project for the construction of a second generation facility for the production of radioactive ion beams (RIBs) by using the ISOL method. The final goal consists in the production of neutron rich RIBs with masses ranging from 80 to 160 by using primary beams of protons, deuterons and light ions with energy of 100 MeV and 100 kW power. This project is proposed to be developed in about 10 years from now and intermediate milestones and experiments are foreseen and under consideration for the next INFN five year plan (1999–2003). In such period of time is proposed the construction of a proton/deuteron accelerator of 10 MeV energy and 10 mA current, consisting of a RFQ (5 MeV, 30 mA) and a linac (10 MeV, 10 mA), and of a neutron area dedicated to the RIBs production, to the BNCT applications and to the neutron physics. Some remarks on the production methods will be presented. The possibility of producing radioisotopes by means of the fission induced by neutrons will be investigated and the methods of production of neutrons will be discussed. ©1999 American Institute of Physics.

 

点击下载:  PDF (384KB)



返 回