Instrumentation and monitoring equipment: provision for modern turbogenerators
作者:
R.M.Booth,
C.S.Cross,
J.R.Rhodes,
期刊:
Power Engineering Journal
(IET Available online 1987)
卷期:
Volume 1,
issue 6
页码: 357-364
ISSN:1479-8344
年代: 1987
DOI:10.1049/pe:19870064
出版商: IEE
数据来源: IET
摘要:
The complexity of modern turbogenerator plant and instrumentation, and reduction in manning levels, means that instrumentation and monitoring equipment is usually located a central control room. It is now essential for instrumentation requirements to be specified at the same time as the main plant
点击下载:
PDF
(1267KB)
返 回