作者: D.I.Medlycott,
期刊: Power Engineering Journal (IET Available online 1987) 卷期: Volume 1, issue 5
页码: 291-293
ISSN:1479-8344
年代: 1987
DOI:10.1049/pe:19870053
出版商: IEE
数据来源: IET
摘要:
A low-cost hydroelectric plant was designed to operate during the rainy season on the Perak River when the flow exceeded the capacity of the existing small hydroelectric station. Original ideas and simple methods can result in low capital costs
点击下载: PDF (1037KB)
返 回
版权所有 © 2009 NSTL国家科技图书文献中心
咨询热线:800-990-8900 010-58882057 Email:service@nstl.gov.cn
地址:北京市复兴路15号 100038 京ICP备05017586号