首页   按字顺浏览 期刊浏览 卷期浏览 Managing Quality Improvement on a Development Pilot Line
Managing Quality Improvement on a Development Pilot Line

 

作者: LevinsonHarry J.,   BenJake,  

 

期刊: Quality Management Journal  (Taylor Available online 1996)
卷期: Volume 3, issue 2  

页码: 16-35

 

ISSN:1068-6967

 

年代: 1996

 

DOI:10.1080/10686967.1996.11918725

 

出版商: Taylor&Francis

 

关键词: cycle time;ISO 9000;productivity;quality leadership;total quality management

 

数据来源: Taylor

 

摘要:

Quality management tools traditionally applied in manufacturing operations were successfully used to reduce development cycle time on a high-technology pilot line. Productivity metrics such as equipment utilization, remark, outgates, and yield were adapted after being suitably modified for application to technology development. Production models, capable of deconvolving the multiple factors that affected the level of development activity, were used to identify those parts of the process in need of improvement. Pareto charts were generated for maximizing the rate of improvement. For every operation and process, work instructions were written within the scope of a document control system, similar in concept to those used in manufacturing operations and largely consistent with the requirements of ISO 9000. A disciplined adherence to the document control system facilitated technology development by providing consistency in operations and records that could be used for analyzing results. In addition to their application to the reduction of development cycle time, quality management tools and statistical process control were successfully applied to defect reduction. The importance of management, in contrast to technical solutions, was revealed when management responsibility for improvement was transferred to managers inexperienced in total quality management; while the engineering staff was left largely intact, the rate of improvement was significantly reduced.

 

点击下载:  PDF (21854KB)



返 回