首页   按字顺浏览 期刊浏览 卷期浏览 A simulation study of MRP capacity planning with uncertain operation times
A simulation study of MRP capacity planning with uncertain operation times

 

作者: T. C. E. CHENG,  

 

期刊: International Journal of Production Research  (Taylor Available online 1987)
卷期: Volume 25, issue 2  

页码: 245-258

 

ISSN:0020-7543

 

年代: 1987

 

DOI:10.1080/00207548708919837

 

出版商: Taylor & Francis Group

 

数据来源: Taylor

 

摘要:

This paper studies the effect of uncertainty on capacity planning in MRP. Two sources of uncertainty are inherent in any capacity planning: (1) fluctuation in product demand and (2) variation in operation work contents. Through the use of computer simulation, experiments are performed on actual operating data supplied by an electronics company. It is found that the accuracy of a capacity plan is approximately a quadratic function of the level of variation in operation work contents and is significantly affected by product demand fluctuation. Theoretical treatment of the data yields the same conclusion, thus suggesting the validity of the simulation results. In view of these findings, the management is advised to exercise close control on the sources of variation so that acceptable accuracy can be achieved in determining a feasible production schedule.

 

点击下载:  PDF (214KB)



返 回