Due dates in job shop scheduling
作者:
SAMUEL EILON,
I. G. CHOWDHURY,
期刊:
International Journal of Production Research
(Taylor Available online 1976)
卷期:
Volume 14,
issue 2
页码: 223-237
ISSN:0020-7543
年代: 1976
DOI:10.1080/00207547608956596
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
Much of job-shop scheduling research is based on the assumption that due dates are outside the control of the scheduler. The paper examines several procedures for specifying due dates, largely dependent on the expected processing time for jobs and on the level of congestion in the shop.
点击下载:
PDF (382KB)
返 回