首页   按字顺浏览 期刊浏览 卷期浏览 Tooling constraints and shop floor scheduling: evaluating the impact of sequence depend...
Tooling constraints and shop floor scheduling: evaluating the impact of sequence dependency

 

作者: SOUMEN GHOSH,   STEVENA. MELNYK,   GARYL. RAGATZ,  

 

期刊: International Journal of Production Research  (Taylor Available online 1992)
卷期: Volume 30, issue 6  

页码: 1237-1253

 

ISSN:0020-7543

 

年代: 1992

 

DOI:10.1080/00207549208942954

 

出版商: Taylor & Francis Group

 

数据来源: Taylor

 

摘要:

In a previous study, we began the process of examining how finite tooling resources affect the operation of a simulated job shop. The paper extends this line of research by focusing on the problem of how to schedule a shop operating with both finite machine and tooling resources, and faced by varying levels of tooling-related sequence dependency in the setups. Four tool assignment rules and two dispatching procedures are evaluated. Findings show the importance of using tool assignment rules which consider not only tool-related information such as tool availability but also the priority of the jobs waiting to be processed. Specifically, as the level of sequence dependence increases and the availability of tooling decreases, the performance of the shop is greatly influenced by the tool assignment rule used to manage the flow of tooling to and from work centres

 

点击下载:  PDF (573KB)



返 回