首页   按字顺浏览 期刊浏览 卷期浏览 Optimal Production Strategies for Plants with Multiple Shutdown Levels and Multiple Pro...
Optimal Production Strategies for Plants with Multiple Shutdown Levels and Multiple Production Lines

 

作者: DonR. Hansen,   SamG. Taylor,  

 

期刊: IIE Transactions  (Taylor Available online 1983)
卷期: Volume 15, issue 1  

页码: 46-53

 

ISSN:0740-817X

 

年代: 1983

 

DOI:10.1080/05695558308974612

 

出版商: Taylor & Francis Group

 

数据来源: Taylor

 

摘要:

When demand is less than plant capacity, aggregate production and demand can be matched by (1) throttling production at a rate equal to demand or (2) producing at capacity production rates and shutting down periodically to reduce inventories. In some plants several levels of shutdown are feasible. For example, a first level of shutdown may involve only equipment, while a second level of shutdown may involve shutting down equipment and laying off workers. Moreover, when a plant has multiple production lines, each line can be throttled or periodically shut down. This paper uses classical optimization techniques to develop optimal production strategies for plants with multiple shutdown levels and multiple, identical production lines.

 

点击下载:  PDF (463KB)



返 回