Combined scheduling system for reducing job tardiness in a job shop
作者:
SHIGEJI MIYAZAKI,
期刊:
International Journal of Production Research
(Taylor Available online 1981)
卷期:
Volume 19,
issue 2
页码: 201-211
ISSN:0020-7543
年代: 1981
DOI:10.1080/00207548108956642
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
Two formulae to give the mean and the standard deviation of job flow-times are derived from the machine number, the load ratio, the required number of operations, and the mean and the standard deviation of processing times, which specify the characteristics of a job shop. On the basis of the two formulae, a method of due-date assignment which contains a due-date adjustment factor is proposed. The assignment method is combined with the sequencing procedure to construct the total scheduling system for reducing job tardiness. Two new dispatching rules are presented as the second phase of the system. The experimental comparison shows that the efficiency of the proposed systems can be better than the conventional scheduling systems
点击下载:
PDF (343KB)
返 回