首页   按字顺浏览 期刊浏览 卷期浏览 Utilizing Weibull Failure Rates in Repair Limit Analysis for Equipment Replacement/Prev...
Utilizing Weibull Failure Rates in Repair Limit Analysis for Equipment Replacement/Preventive Maintenance Decisions

 

作者: LoveC. E.,   GuoR.,  

 

期刊: Journal of the Operational Research Society  (Taylor Available online 1996)
卷期: Volume 47, issue 11  

页码: 1366-1376

 

ISSN:0160-5682

 

年代: 1996

 

DOI:10.1057/jors.1996.172

 

出版商: Taylor&Francis

 

关键词: equipment replacement;vehicle replacement;repair limit;preventive maintenance

 

数据来源: Taylor

 

摘要:

AbstractRepair limit analysis was originally proposed as a methodology for determining whether to repair or to replace an operating unit. The approach structures the problem as a Markov or semi-Markov decision process in which state-dependent repair limits trigger the replacement decision. Such a basic framework can easily be applied to more general equipment repair/overhaul environments in which typical maintenance condition monitoring information can serve as the overhaul trigger. One unnecessary limitation of repair limit analysis found in the literature is the use of a constant force of mortality within each state of the model. The purpose of this paper is to extend the repair limit analysis by incorporating a changing force of mortality as the unit ages. In this way, the analysis is more flexible in the parameter estimation phase and it is argued here more appealing since a changing (and usually increasing) force of mortality is utilized in equipment maintenance environments.

 

点击下载:  PDF (5308KB)



返 回