首页   按字顺浏览 期刊浏览 卷期浏览 Potential performance of dock versus line assembly
Potential performance of dock versus line assembly

 

作者: LARS-GÖRAN ROSENGREN,  

 

期刊: International Journal of Production Research  (Taylor Available online 1981)
卷期: Volume 19, issue 2  

页码: 139-152

 

ISSN:0020-7543

 

年代: 1981

 

DOI:10.1080/00207548108956637

 

出版商: Taylor & Francis Group

 

数据来源: Taylor

 

摘要:

The potential performance of two different ways of designing truck assembly systems, namely line and dock assembly, are analysed. The line system denotes assembly at a mechanically paced moving belt with fixed items, divided in several one-worker stations with a common station time around 20 minutes and located in parallel with up to three other stations. The dock system denotes assembly at stations with typical station times around 4 hours; the items are moved between stations by the workers, who are divided in groups of around ten persons assembling complete trucks. Theoretical models for these specific systems are presented, which together with the results are applicable to more general situations.

 

点击下载:  PDF (530KB)



返 回