A multi-objective two-stage approach to the design of communication networks subject to production constraints for computerized manufacturing systems
作者:
TARUN GUPTA,
BIMANK. GHOSH,
期刊:
International Journal of Production Research
(Taylor Available online 1989)
卷期:
Volume 27,
issue 4
页码: 587-598
ISSN:0020-7543
年代: 1989
DOI:10.1080/00207548908942570
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
A two stage model for joint optimization of production volume and communication system cost for a multi-product manufacturing system has been developed. Stage I minimizes penalty cost, which includes costs due to under-achievement of production targets and over-fulfilment of production capacities, and determines the optimal production volumes in order to achieve the desired production plan with the available physical capacities at various stations. Stage II determines optimal design parameters for communication systems while minimizing the total penalty cost and achieving the near-optimal production volumes of stage I. A case example is discussed thereafter which illustrates the importance of joint optimization of resources as against independent optimization.
点击下载:
PDF (381KB)
返 回