首页   按字顺浏览 期刊浏览 卷期浏览 Mean Action Time of theX̄Control Chart with Warning Limits
Mean Action Time of theX̄Control Chart with Warning Limits

 

作者: WeindlingJoachim I.,   LittauerSebastian B.,   De OliveiraJ. Tiago,  

 

期刊: Journal of Quality Technology  (Taylor Available online 1970)
卷期: Volume 2, issue 2  

页码: 79-85

 

ISSN:0022-4065

 

年代: 1970

 

DOI:10.1080/00224065.1970.11980418

 

出版商: Taylor&Francis

 

关键词: Control Chart;Mean Action Time;Run Length;Warning Limits

 

数据来源: Taylor

 

摘要:

The Shewhart control chart for means can be made more sensitive to small changes by adding a pair of warning limits, located inside the action limits, and taking action when a run of a specified number of consecutive means falls between the warning and action lines. Sensitivity is measured by the mean action time (M.A.T.) as function of the shift in the mean of the process. This paper discusses in detail the individual and combined effects upon the level and shape of the M.A.T. functions, of changes in the location of the action and warning limits and the critical run length. Great flexibility in parameter selections yields charts that give much larger M.A.T.'s when the process is in control, yet will detect shifts of certain magnitudes more rapidly than Shewhart charts.

 

点击下载:  PDF (895KB)



返 回