Project scheduling: The effects of problem structure on heuristic performance
作者:
James H. Patterson,
期刊:
Naval Research Logistics Quarterly
(WILEY Available online 1976)
卷期:
Volume 23,
issue 1
页码: 95-123
ISSN:0028-1441
年代: 1976
DOI:10.1002/nav.3800230110
出版商: Wiley Subscription Services, Inc., A Wiley Company
数据来源: WILEY
摘要:
AbstractIndividual characteristics of multiple‐constrained resource, project scheduling problems are examined in an attempt to predict the solution obtainable with heuristic methods. Difficulties encountered in performing this type of research are described, and several multiple regression models are developed for predicting heuristic performance. Both single and multiple project data are examined, and results reported demonstrate the efficacy of determining beforehand the method used for problem solutio
点击下载:
PDF
(1292KB)
返 回