首页   按字顺浏览 期刊浏览 卷期浏览 Controlling le shuttle signalling for the channel tunnel
Controlling le shuttle signalling for the channel tunnel

 

作者: PaulRobins,  

 

期刊: IEE Review  (IET Available online 1993)
卷期: Volume 39, issue 4  

页码: 156-157

 

ISSN:0953-5683

 

年代: 1993

 

DOI:10.1049/ir:19930075

 

出版商: IEE

 

数据来源: IET

 

摘要:

The Channel Tunnel is 50 km long and will have to carry up to one train every 3 minutes. Its signalling system is sophisticated and failsafe.

 

点击下载:  PDF (403KB)



返 回