Force Measurements On A Navigable Ice Boom
作者:
M. S. Uzuner,
J. J. Peter,
D. C. N. Robb,
期刊:
Journal of Hydraulic Research
(Taylor Available online 1977)
卷期:
Volume 15,
issue 2
页码: 179-187
ISSN:0022-1686
年代: 1977
DOI:10.1080/00221687709499655
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
Summary The St. Lawrence Seaway Development Corporation in the U.S.A. has been assigned with the task of demonstrating the feasibility of winter navigation on the St. Lawrence River. As a part of this program, an ice boom was designed, installed, and instrumented at Copeland Cut in the Wiley-Donden Canal near Massena, New York. In order to measure forces exerted on the boom elements by the ice cover, twenty tension transducers were designed, built and located in the critical members of the boom. Force measurements were made before, during, and after ship transits through the ice cover and boom opening. Typical signal recording of several of the tension transducers are presented.
点击下载:
PDF (5694KB)
返 回