作者: Yoshiharu Mori,
期刊: AIP Conference Proceedings (AIP Available online 1900) 卷期: Volume 542, issue 1
页码: 215-219
ISSN:0094-243X
年代: 1900
DOI:10.1063/1.1336257
出版商: AIP
数据来源: AIP
摘要:
A possible scheme of the neutrino factory in Japan based on the 50-GeV PS of the KEK-JAERI joint project is described. In this scheme, beam power of about 1 MW is expected from the 50-GeV PS with a repetition rate of about 0.4 Hz. ©2000 American Institute of Physics.
点击下载: PDF (395KB)
返 回
版权所有 © 2009 NSTL国家科技图书文献中心
咨询热线:800-990-8900 010-58882057 Email:service@nstl.gov.cn
地址:北京市复兴路15号 100038 京ICP备05017586号