The Effect of Short Production Runs on CSP-1
作者:
M.T. R. Blackwell,
期刊:
Technometrics
(Taylor Available online 1977)
卷期:
Volume 19,
issue 3
页码: 259-263
ISSN:0040-1706
年代: 1977
DOI:10.1080/00401706.1977.10489547
出版商: Taylor & Francis Group
关键词: Attribute Sampling;Continuous Sampling;CSP-I;Average Fraction Inspected;Markov Chain
数据来源: Taylor
摘要:
The criterion for choosing which CSP-1 to employ for continuous production screening is usually the AOQL. This is based on the average fraction inspected (AFI), which has only been calculated analytically under the assumption of an infinite production run. For short production runs the AFI is higher because of the starting procedure of the plan. A formula is derived which gives a good approximation to the AFI for a finite production run.
点击下载:
PDF (377KB)
返 回