首页   按字顺浏览 期刊浏览 卷期浏览 The Effect of Short Production Runs on CSP-1
The Effect of Short Production Runs on CSP-1

 

作者: M.T. R. Blackwell,  

 

期刊: Technometrics  (Taylor Available online 1977)
卷期: Volume 19, issue 3  

页码: 259-263

 

ISSN:0040-1706

 

年代: 1977

 

DOI:10.1080/00401706.1977.10489547

 

出版商: Taylor & Francis Group

 

关键词: Attribute Sampling;Continuous Sampling;CSP-I;Average Fraction Inspected;Markov Chain

 

数据来源: Taylor

 

摘要:

The criterion for choosing which CSP-1 to employ for continuous production screening is usually the AOQL. This is based on the average fraction inspected (AFI), which has only been calculated analytically under the assumption of an infinite production run. For short production runs the AFI is higher because of the starting procedure of the plan. A formula is derived which gives a good approximation to the AFI for a finite production run.

 

点击下载:  PDF (377KB)



返 回