Production control with variable speeds and inspection points
作者:
DMITRII. GOLENKO-GINZBURG,
ZILLA SINUANY-STERN,
期刊:
International Journal of Production Research
(Taylor Available online 1989)
卷期:
Volume 27,
issue 4
页码: 629-636
ISSN:0020-7543
年代: 1989
DOI:10.1080/00207548908942573
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
The problem of production control with disturbances is introduced. Given the target amount needed, the due date and the amount produced up to a certain inspection point, we have to determine the new production speed and the next inspection point so that the minimal speed will guarantee meeting the target points on time on the average. Two objectives are imbedded in this heuristic algorithm: to minimize the number of inspection points, and to maximize the probability of completing the production on the due date. A stochastic optimization formulation is presented followed by a heuristic solution, a numerical example is given, and simulation results are presented.
点击下载:
PDF (289KB)
返 回