首页   按字顺浏览 期刊浏览 卷期浏览 RESOURCE ALLOCATION: TOWARD A PRACTICAL SOLUTION
RESOURCE ALLOCATION: TOWARD A PRACTICAL SOLUTION

 

作者: OSAMA ALKAYYALI,   ISSAM MINKARAH,   GEORGE SUKARIEH,  

 

期刊: Civil Engineering Systems  (Taylor Available online 1994)
卷期: Volume 11, issue 1  

页码: 19-41

 

ISSN:0263-0257

 

年代: 1994

 

DOI:10.1080/02630259408970135

 

出版商: Taylor & Francis Group

 

关键词: Resource allocation;resource leveling;decision-making algorithm;construction

 

数据来源: Taylor

 

摘要:

This paper presents a resource allocation algorithm for construction planning and control. The algorithm integrates the use of experience, decision-making criteria, a utility/cost matrix, an optimization procedure and a resource-smoothing heuristic. First, a planner uses his/her experience and the optimization procedure to develop several scheduling alternatives for reallocating a resource that is limited for a given interval (period-1) during the execution of a project. Next, the planner selects the best scheduling alternative by using the utility/cost matrix, where he/she can set performance goals and their relative importance according to his/her experience and company policy. Finally, the planner uses the optimization procedure and the resource-smoothing heuristic to reschedule the available resource efficiently within the remaining part of the project (period-2). The suggested method provides the user with a feasible solution that meets preset scheduling standards and planning criteria and accounts for the circumstances at the time the decision is made.

 

点击下载:  PDF (652KB)



返 回