首页   按字顺浏览 期刊浏览 卷期浏览 Annacis cable-stayed bridge—design for earthquake
Annacis cable-stayed bridge—design for earthquake

 

作者: P. R. Taylor,   A. M. van Selst,   W. E. Hodge,   R. G. Sexsmith,  

 

期刊: Canadian Journal of Civil Engineering  (NRC Available online 1985)
卷期: Volume 12, issue 3  

页码: 472-482

 

ISSN:0315-1468

 

年代: 1985

 

DOI:10.1139/l85-055

 

出版商: NRC Research Press

 

数据来源: NRC

 

摘要:

The 465 m span Annacis cable-stayed bridge, currently under construction near Vancouver, British Columbia, will be the longest cable-stayed span in the world when it is completed in 1986. As this bridge is partially founded on soft delta deposits and is located within 80 km of a seismic source zone, its design has required careful consideration of earthquake effects. This paper reports the seismic analytical and design approaches adopted for the foundations and superstructure of the bridge. Details covered include dynamic modelling of the subsoil layers, correlation of measured surface accelerations with those predicted by computer modelling from nearby rock accelerations, earthquake risk analysis, assessment of the soil liquefaction potential, compliance of deep piles and pier translation during ground shaking, dynamic modelling of the superstructure, ductility and displacement demands in the superstructure, and details for construction.Key words: bridges, earthquake.

 

点击下载:  PDF (575KB)



返 回