首页   按字顺浏览 期刊浏览 卷期浏览 Demonstration of two-beam acceleration and 30 GHz power production in the CLIC Test Fac...
Demonstration of two-beam acceleration and 30 GHz power production in the CLIC Test Facility

 

作者: R. Bossart,   H. H. Braun,   G. Carron,   M. Chanudet,   F. Chautard,   J. P. Delahaye,   J. C. Godot,   S. Hutchins,   C. Martinez,   G. Suberlucq,   P. Tenenbaum,   L. Thorndahl,   H. Trautner,   M. Valentini,   I. Wilson,   W. Wuensch,  

 

期刊: AIP Conference Proceedings  (AIP Available online 1999)
卷期: Volume 474, issue 1  

页码: 23-30

 

ISSN:0094-243X

 

年代: 1999

 

DOI:10.1063/1.59015

 

出版商: AIP

 

数据来源: AIP

 

摘要:

The Compact Linear Collider (CLIC) Test Facility (CTF II) at CERN has recently demonstrated Two-Beam power production and acceleration at 30 GHz. With 41 MW of 30 GHz power produced in 14 ns pulses at a repetition rate of 5 Hz, the main beam has been accelerated by 28 MeV. The 30 GHz RF power is extracted in low impedance decelerating structures from a low-energy, high-current “drive beam” which runs parallel to the main beam. The average current in the drive-beam train is 25 A, while the peak current exceeds 2 kA. Crosschecks between measured drive-beam charge, 30 GHz power and main-beam energy gain are in good agreement. In this paper, some relevant experimental and technical issues on drive-beam generation, two-beam power production and acceleration are presented. ©1999 American Institute of Physics.

 

点击下载:  PDF (592KB)



返 回