Demonstration of two-beam acceleration and 30 GHz power production in the CLIC Test Facility
作者:
R. Bossart,
H. H. Braun,
G. Carron,
M. Chanudet,
F. Chautard,
J. P. Delahaye,
J. C. Godot,
S. Hutchins,
C. Martinez,
G. Suberlucq,
P. Tenenbaum,
L. Thorndahl,
H. Trautner,
M. Valentini,
I. Wilson,
W. Wuensch,
期刊:
AIP Conference Proceedings
(AIP Available online 1999)
卷期:
Volume 474,
issue 1
页码: 23-30
ISSN:0094-243X
年代: 1999
DOI:10.1063/1.59015
出版商: AIP
数据来源: AIP
摘要:
The Compact Linear Collider (CLIC) Test Facility (CTF II) at CERN has recently demonstrated Two-Beam power production and acceleration at 30 GHz. With 41 MW of 30 GHz power produced in 14 ns pulses at a repetition rate of 5 Hz, the main beam has been accelerated by 28 MeV. The 30 GHz RF power is extracted in low impedance decelerating structures from a low-energy, high-current “drive beam” which runs parallel to the main beam. The average current in the drive-beam train is 25 A, while the peak current exceeds 2 kA. Crosschecks between measured drive-beam charge, 30 GHz power and main-beam energy gain are in good agreement. In this paper, some relevant experimental and technical issues on drive-beam generation, two-beam power production and acceleration are presented. ©1999 American Institute of Physics.
点击下载:
PDF
(592KB)
返 回