Formulation for a fixed-charge, separable nonlinear production planning problem
作者:
S. RAHMAN,
J. A. NACHLAS,
期刊:
International Journal of Production Research
(Taylor Available online 1983)
卷期:
Volume 21,
issue 5
页码: 713-722
ISSN:0020-7543
年代: 1983
DOI:10.1080/00207548308942405
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
A production planning problem for which the objective function contains both separable and fixed-charge components is formulated under the assumptions of separable constraint functions and a- minimum production level. It is shown that for this problem, the well known application of the λ separation technique can be extended to allow the separation variables, λ, to represent the fixed charge component as well as the nonlinear components of the objective function. The result is the formulation of an approximating problem that has a degree of solution complexity comparable to that of usual separable programs. An application of such formulation to the electric utility generation scheduling problem is presented.
点击下载:
PDF (292KB)
返 回