A Case Study of An Industrial Assessment Center Extended Assessment
作者:
WarrenM. Heffington,
JamesA. Eggebrecht,
GalynD. Gafford,
HussamE. Farouz,
期刊:
Energy Engineering
(Taylor Available online 1999)
卷期:
Volume 96,
issue 4
页码: 19-39
ISSN:0199-8595
年代: 1999
DOI:10.1080/01998595.1999.10530466
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
This article describes an extended assessment of a manufacturing plant. The assessment was extended by adding monitoring of selected electrical systems in the plant with portable data loging equipment, making two additional plant visits to install and remove equipment, and identifying possible assessment recommendations for later investigation. Monitoring identified three recommendations about equipment being left on that likely would not have been identified during a usual assessment, and provided data for quantification of savings. Plant management identified a desirable operational change from the monitored data. In addition, the additional time spent in the plant increased the potential recommendation list and the final recommendation list by about a factor of two.
点击下载:
PDF (5784KB)
返 回