Regression-based due date assignment rules for improved assembly shop performance
作者:
C. H. SMITH,
E. D. MINOR,
H. J. WEN,
期刊:
International Journal of Production Research
(Taylor Available online 1995)
卷期:
Volume 33,
issue 9
页码: 2375-2385
ISSN:0020-7543
年代: 1995
DOI:10.1080/00207549508904821
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
Many simulation studies have evaluated sequencing rules and due date assignment methods for scheduling job shops. More recently researchers have studied multistage, or assembly, shops. Typically, due dates have been set by using a fixed multiple of the critical path length. This paper evaluates the effects on shop performance due to using a regression-based approach for setting due dates. The findings show that marked improvement in the performance of dispatching rules can occur when the proposed due date setting procedure is used.