首页   按字顺浏览 期刊浏览 卷期浏览 Water balance estimate for Georgian Bay in 1974
Water balance estimate for Georgian Bay in 1974

 

作者: W. M. Schertzer,   E. B. Bennett,   F. Chiocchio,  

 

期刊: Water Resources Research  (WILEY Available online 1979)
卷期: Volume 15, issue 1  

页码: 77-84

 

ISSN:0043-1397

 

年代: 1979

 

DOI:10.1029/WR015i001p00077

 

数据来源: WILEY

 

摘要:

Current meter observations and hydrological and meteorological data collected primarily during 1974 formed the basis upon which the monthly water balance of Georgian Bay could be estimated. The data were used to derive a first approximation of the exchange of water between Georgian Bay and main Lake Huron. The net exchange across Main Channel at depths greater than 5 m was determined from extensive current meter observations while the exchange in the upper 5 m was the residual necessary to achieve a balanced water budget. The results illustrate that during the stratified season (May through November) the transport of water through Main Channel is also stratified with surface water moving into Georgian Bay from main Lake Huron while continuity is maintained by net outflow at depths greater than 5 m. Total annual supply from runoff and direct precipitation is nearly twice as large as combined losses from evaporation and flow to North Channel. Residence and flushing times for water in the bay are estimated at 5.1 and 5.7 years, respectively.

 

点击下载:  PDF (646KB)



返 回