首页   按字顺浏览 期刊浏览 卷期浏览 Status report of the munich tandem accelerator
Status report of the munich tandem accelerator

 

作者: L. Rohrer,   Tandem Staff,  

 

期刊: AIP Conference Proceedings  (AIP Available online 1999)
卷期: Volume 473, issue 1  

页码: 88-91

 

ISSN:0094-243X

 

年代: 1999

 

DOI:10.1063/1.58969

 

出版商: AIP

 

数据来源: AIP

 

摘要:

The Munich MP tandem accelerator is in operation since 1970. Now it is equipped with a NEC Pelletron charging system and HVEC stainless steel tubes. The negative ion injector and the high energy extension with the analyzing system were completely reconstructed. Also the instrumentation was improved continuously. The tandem is used in an increasing degree not only for nuclear and atomic physics, but also for biological and material science work. ©1999 American Institute of Physics.

 

点击下载:  PDF (314KB)



返 回