首页   按字顺浏览 期刊浏览 卷期浏览 Construction of superconducting RFQs at INFN-LNL
Construction of superconducting RFQs at INFN-LNL

 

作者: G. Bisoffi,   V. Andreev,   E. Bissiato,   M. Comunian,   F. Chiurlotto,   E. Corradin,   M. Lollo,   A. Lombardi,   A. Pisent,   A. M. Porcellato,   T. Shirai,   E. Tovo,   R. Tovo,  

 

期刊: AIP Conference Proceedings  (AIP Available online 1999)
卷期: Volume 473, issue 1  

页码: 173-184

 

ISSN:0094-243X

 

年代: 1999

 

DOI:10.1063/1.58944

 

出版商: AIP

 

数据来源: AIP

 

摘要:

The tests on the stainless steel prototype for one of the two superconducting RFQs (SRFQs) for PIAVE (SRFQ2), the being built heavy ion injector for the Legnaro booster, were completed in summer 1998, while the construction of the first niobium resonator started in February 1998 and is expected to be completed by April 1999. The structure, resonating at 80 MHz, is 0.8 m long and 0.76 m in diameter. All technological aspects connected with the construction of the SRFQs, and the corresponding tests on the stainless steel model, are reviewed: development of the parts, assembly sequence, electron beam welding (EBW) steps, rough and fine adjustment of the resonant frequency, bead-pull measurements, characterization of the mechanical vibration modes, frequency change due to cooling down and chemical etching tests. The updated development of SRFQ1 is briefly reviewed. ©1999 American Institute of Physics.

 

点击下载:  PDF (1751KB)



返 回