首页   按字顺浏览 期刊浏览 卷期浏览 Optimal inspection policies in a serial production system including scrap rework and re...
Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach

 

作者: BONGJIN YUM†,   EDWARDD. McDOWELLJ‡,  

 

期刊: International Journal of Production Research  (Taylor Available online 1987)
卷期: Volume 25, issue 10  

页码: 1451-1464

 

ISSN:0020-7543

 

年代: 1987

 

DOI:10.1080/00207548708919925

 

出版商: Taylor & Francis Group

 

数据来源: Taylor

 

摘要:

The allocation of inspection effort problem for aerial systems is formulated as a 0-1 mixed integer linear programming problem. This formulation permits any combination of scrap, rework, or repair at each station and allows the problem to be solved using standard MILP software packages. Moreover electronic spread-sheets may be used to easily calculate the relevant coefficients. An additional advantage of this approach when compared with the traditional dynamic programming approach is the ease with which the basic model may be modified. For example, it is shown how the model may easily be modified to include both a material and a production constraint and to select between various material suppliers. Sensitivity analysis is also easily performed with this approach. This model is then used to show that the optimal inspection policy is dependent on whether a production or a material requirement is used.

 

点击下载:  PDF (436KB)



返 回