Scheduling for a combination of made-to-stock and made-to-order jobs in a job shop
作者:
MIN-FENG WANG,
MATTHEW ROSENSHINE,
期刊:
International Journal of Production Research
(Taylor Available online 1983)
卷期:
Volume 21,
issue 5
页码: 607-616
ISSN:0020-7543
年代: 1983
DOI:10.1080/00207548308942398
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
This paper deals with selecting a heuristic rule for concurrent scheduling of mixtures of due-date and non-due-date jobs. The measure of performance for the mixture of jobs is chosen to be mean flowtime subject to the constraint that due dates are satisfied. To handle varying levels of due-date tightness, three types of schedules are introduced. Dispatching rules for two of the three types of schedules were selected by simulation. Decision rules for determining the best schedules in appropriate situations are suggested.
点击下载:
PDF (327KB)
返 回