International Journal of Production Research


ISSN: 0020-7543        年代:1989
当前卷期:Volume 27  issue 2     [ 查看所有卷期 ]

年代:1989
 
     Volume 27  issue 1   
     Volume 27  issue 2
     Volume 27  issue 3   
     Volume 27  issue 4   
     Volume 27  issue 5   
     Volume 27  issue 6   
     Volume 27  issue 7   
     Volume 27  issue 8   
     Volume 27  issue 9   
     Volume 27  issue 10   
     Volume 27  issue 11   
     Volume 27  issue 12   
1. Final assembly sequencing for just-in-time manufacturing
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  199-213

H. GROEFLIN,   H. LUSS,   M. B. ROSENWEIN,   E. T. WAHLS,  

Preview   |   PDF (528KB)

2. Flexible assembly systems: test results for an approach for near real-time scheduling and routing of multiple products
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  215-227

MARKUS DONATH,   ROBERTJ. GRAVES,  

Preview   |   PDF (318KB)

3. Workpiece-fixture interactions in a compacted fluidized-bed fixture under various loading conditions
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  229-246

BRIANS. THOMPSONS,   MUKESHV. GANDHI,   D. J. DESAI,  

Preview   |   PDF (481KB)

4. Effects of alternate routings under variable lot-size conditions
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  247-259

TERENCEM. HANCOCK,  

Preview   |   PDF (402KB)

5. Multiple projects-multiple resources-constrained scheduling: some studies
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  261-280

R. P. MOHANTY,   M. K. SIDDIQ,  

Preview   |   PDF (490KB)

6. A framework for quantitative comparison of production control concepts
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  281-292

H. GRÜNWALD,   P. E. T. STRIEKWOLD,   P. J. WEEDA,  

Preview   |   PDF (403KB)

7. A heuristic algorithm for the quadratic assignment formulation to the plant layout problem
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  293-308

BOAZ GOLANY,   MEIRJ. ROSENBLATT,  

Preview   |   PDF (416KB)

8. A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  309-352

YASHP. GUPTA,   MAHESHC. GUPTA,  

Preview   |   PDF (1136KB)

9. The use of value-based priorities when early shipments are forbidden†
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  353-369

GARYD. SCUDDER,   THOMASR. HOFFMANN,  

Preview   |   PDF (484KB)

10. A review of: “Just-in-Time Manufacture.” Edited by C. A. VOSS (IFS (Publications) Ltd. and Springer Verlag, 1987.) [Pp. 398.] Price: £39 (UK)
  International Journal of Production Research,   Volume  27,   Issue  2,   1989,   Page  371-372

JOHN MIDDLE,  

Preview   |   PDF (89KB)

首页 上一页 下一页 尾页 第1页 共11条