International Journal of Production Research


ISSN: 0020-7543        年代:1976
当前卷期:Volume 14  issue 2     [ 查看所有卷期 ]

年代:1976
 
     Volume 14  issue 1   
     Volume 14  issue 2
     Volume 14  issue 3   
     Volume 14  issue 4   
     Volume 14  issue 5   
     Volume 14  issue 6   
1. Profile boring operations. Results of recent research with new designs of damped boring bars. Tests on damped boring bars using known vibratory forces
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  149-169

K. W. NG,   R. W. NEW,  

Preview   |   PDF (1072KB)

2. The effective interfacial shear strength characteristics of copper telluride, copper sulphide and lead coated SAE 1045 steel-high speed steel materials when subjected to load conditions causing bulk plastic deformation
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  171-181

JOHN WILLIAMS,   DANIEL MCCARTHY,  

Preview   |   PDF (1700KB)

3. Some aspects of optimum specimen conditions for using torsion testing as an aid to predict process limits
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  183-198

R. MTNAI-FAR,   E. A. PEIRCE,   R. J. GRIEVE,  

Preview   |   PDF (486KB)

4. Optimal production planning for a multiproduct, multistage production system
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  199-213

KATSUNDO HITOMI,   NOBUTO NAKAMURA,  

Preview   |   PDF (369KB)

5. A multiple goal linear programming model for coordinated production and logistics planning
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  215-222

K. D. LAWRENCE,   J. J. BURBRIDGE,  

Preview   |   PDF (227KB)

6. Due dates in job shop scheduling
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  223-237

SAMUEL EILON,   I. G. CHOWDHURY,  

Preview   |   PDF (382KB)

7. Model adaptive scheduling for solving perturbation problems in the cloth industry
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  239-250

L. LATECOERE,   J. BOEBION,   L. PUN,  

Preview   |   PDF (331KB)

8. An investigation of a two-stage production line with normally distributed interarrival and service time distributions
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  251-261

G. R. McGEE,   D. B. WEBSTER,  

Preview   |   PDF (389KB)

9. Parameter estimation for distributions associated with the facilities design problem
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  263-274

H. WALLACE,   G. G. HITCHINGS,   D. R. TOWILL,  

Preview   |   PDF (337KB)

10. A decision-making process for the real time control of a production unit†
  International Journal of Production Research,   Volume  14,   Issue  2,   1976,   Page  275-284

J. ERSCHLER,   F. ROUBELLAT,   J. P. VERNHES,  

Preview   |   PDF (317KB)

首页 上一页 下一页 尾页 第1页 共15条