International Journal of Production Research


ISSN: 0020-7543        年代:1984
当前卷期:Volume 22  issue 2     [ 查看所有卷期 ]

年代:1984
 
     Volume 22  issue 1   
     Volume 22  issue 2
     Volume 22  issue 3   
     Volume 22  issue 4   
     Volume 22  issue 5   
     Volume 22  issue 6   
1. FALSA-facilities allocation by statistical analysis Part I. Further investigations on the cost distribution associated with the problem of facilities design
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  173-181

P. B. MAHAPATRAf,   D. S. BEDT,  

Preview   |   PDF (263KB)

2. FALSA-Facilities allocation by statistical analysis Part II. An heuristic algorithm to the problem of facilities design
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  183-191

P. B. MAHAPATRA,   D. S. BKD,  

Preview   |   PDF (254KB)

3. A comparative study of the performance of pure and hybrid group technology manufacturing systems using computer simulation techniques
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  193-233

C. L. ANG,   P. C. T. WILLEY,  

Preview   |   PDF (1205KB)

4. The effect of incompletion cost on line balancing with multiple manning of work stations
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  235-245

AVRAHAM SHTTJB,  

Preview   |   PDF (378KB)

5. On the estimation of parameters for a nonlinear model of a milling process
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  247-252

W. C. K. VVONG,   D. MTDDLETON,  

Preview   |   PDF (219KB)

6. Computer-aided process planning: past, present and future
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  253-266

HAROLDJ. STEUDEL,  

Preview   |   PDF (605KB)

7. Capturing production engineering practice within a CADCAM system
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  267-280

R. G. HANNAM,   J. C. S. PLUMMER,  

Preview   |   PDF (514KB)

8. A comprehensive flowline classification scheme
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  281-297

N. A. G. ANEKE,   A. S. CARRIER,  

Preview   |   PDF (496KB)

9. Looping in a multistage production system
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  299-311

TARUN GUPTA,   SUBRATA CHAKRABORTY,  

Preview   |   PDF (299KB)

10. Discontinuous optimization in batch production using SUMT
  International Journal of Production Research,   Volume  22,   Issue  2,   1984,   Page  313-321

I. I. IMO,   D. J. LEECH,  

Preview   |   PDF (217KB)

首页 上一页 下一页 尾页 第1页 共12条