| 11. |
Computer software could replace part-programmers |
| |
Production Engineer,
Volume 62,
Issue 5,
1983,
Page 41-41
Preview
|
PDF (1150KB)
|
|
DOI:10.1049/tpe.1983.0103
出版商:IEE
年代:1983
数据来源: IET
|
| 12. |
Bridgeport builds £2m FMS to make Japanese machine |
| |
Production Engineer,
Volume 62,
Issue 5,
1983,
Page 43-44
Preview
|
PDF (1486KB)
|
|
DOI:10.1049/tpe.1983.0104
出版商:IEE
年代:1983
数据来源: IET
|
| 13. |
Robot vision: aiming to match the human eye |
| |
Production Engineer,
Volume 62,
Issue 5,
1983,
Page 45-46
Preview
|
PDF (1013KB)
|
|
DOI:10.1049/tpe.1983.0105
出版商:IEE
年代:1983
数据来源: IET
|
| 14. |
Lucas Bryce to install five-axis grinder in cell |
| |
Production Engineer,
Volume 62,
Issue 5,
1983,
Page 47-47
Preview
|
PDF (618KB)
|
|
DOI:10.1049/tpe.1983.0106
出版商:IEE
年代:1983
数据来源: IET
|
| 15. |
Why more British firms have not set up quality circles |
| |
Production Engineer,
Volume 62,
Issue 5,
1983,
Page 48-48
Preview
|
PDF (564KB)
|
|
DOI:10.1049/tpe.1983.0107
出版商:IEE
年代:1983
数据来源: IET
|
| 16. |
Modularity in design is key to success for Asquith '81 |
| |
Production Engineer,
Volume 62,
Issue 5,
1983,
Page 50-50
Preview
|
PDF (823KB)
|
|
DOI:10.1049/tpe.1983.0108
出版商:IEE
年代:1983
数据来源: IET
|