1. |
There has to be a better way than this |
|
Production Engineer,
Volume 59,
Issue 2,
1980,
Page 17-21
Preview
|
PDF (1392KB)
|
|
DOI:10.1049/tpe.1980.0029
出版商:IEE
年代:1980
数据来源: IET
|
2. |
The facts on Finniston |
|
Production Engineer,
Volume 59,
Issue 2,
1980,
Page 26-31
Preview
|
PDF (1497KB)
|
|
DOI:10.1049/tpe.1980.0030
出版商:IEE
年代:1980
数据来源: IET
|
3. |
How powder coating removes the paint — shop bottleneck for Theorn Domestic |
|
Production Engineer,
Volume 59,
Issue 2,
1980,
Page 33-34
Preview
|
PDF (1196KB)
|
|
DOI:10.1049/tpe.1980.0031
出版商:IEE
年代:1980
数据来源: IET
|
4. |
Why does Britain want Quality Circles? |
|
Production Engineer,
Volume 59,
Issue 2,
1980,
Page 45-46
Preview
|
PDF (807KB)
|
|
DOI:10.1049/tpe.1980.0032
出版商:IEE
年代:1980
数据来源: IET
|
5. |
How to predict the benefits of Group Technology |
|
Production Engineer,
Volume 59,
Issue 2,
1980,
Page 51-54
BarryDale,
PhilipWilley,
Preview
|
PDF (1205KB)
|
|
摘要:
Use this article to help decide whether Group Technology (GT) is for you.
DOI:10.1049/tpe.1980.0033
出版商:IEE
年代:1980
数据来源: IET
|