1. |
The threat |
|
Production Engineer,
Volume 56,
Issue 4,
1977,
Page 3-3
MauriceHewitt,
Preview
|
PDF (113KB)
|
|
DOI:10.1049/tpe.1977.0023
出版商:IEE
年代:1977
数据来源: IET
|
2. |
A case study on cnc turning |
|
Production Engineer,
Volume 56,
Issue 4,
1977,
Page 29-31
JohnFenton,
Preview
|
PDF (698KB)
|
|
DOI:10.1049/tpe.1977.0037
出版商:IEE
年代:1977
数据来源: IET
|
3. |
Microprocessors in machine automation |
|
Production Engineer,
Volume 56,
Issue 4,
1977,
Page 32-36
GCKean,
RSavage,
EGECullen,
Preview
|
PDF (2769KB)
|
|
DOI:10.1049/tpe.1977.0038
出版商:IEE
年代:1977
数据来源: IET
|
4. |
A computerised planning procedure for machined components |
|
Production Engineer,
Volume 56,
Issue 4,
1977,
Page 37-42
G.Halevi,
K.J.Stout,
Preview
|
PDF (1014KB)
|
|
DOI:10.1049/tpe.1977.0039
出版商:IEE
年代:1977
数据来源: IET
|
5. |
Scope—the development of a production management system |
|
Production Engineer,
Volume 56,
Issue 4,
1977,
Page 45-47
T.M.Spence,
Preview
|
PDF (1030KB)
|
|
DOI:10.1049/tpe.1977.0040
出版商:IEE
年代:1977
数据来源: IET
|
6. |
Manufacturing and computers prolamat '76 |
|
Production Engineer,
Volume 56,
Issue 4,
1977,
Page 51-51
I.D.Nussey,
Preview
|
PDF (316KB)
|
|
DOI:10.1049/tpe.1977.0041
出版商:IEE
年代:1977
数据来源: IET
|