1. |
Technology at work |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 10-11
Preview
|
PDF (2508KB)
|
|
DOI:10.1049/tpe.1987.0027
出版商:IEE
年代:1987
数据来源: IET
|
2. |
5-axis model making saves time and money |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 15-17
AustinRover,
Preview
|
PDF (423KB)
|
|
摘要:
Making a model of a car body design has posed many problems in the past for automotive manufacturers. Austin Rover believes it has found the solution with its new 5-axis model making machine. Abid Khalil, project engineer at Austin Rover, and Anne Powell investigate.
DOI:10.1049/tpe.1987.0028
出版商:IEE
年代:1987
数据来源: IET
|
3. |
Accounting for progress |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 18-19
Preview
|
PDF (348KB)
|
|
摘要:
Production lines are not the only areas to be affected by the current ‘hi-tech’ revolution. Companies that are investing large amounts of capital in advanced manufacturing technologies must also take a long and serious look at the way they do their books. CAM-1, an international research and development organisation, is working at the moment on a major project to identify the deficiencies in today's cost management system and to develop a prototype for the future. Carissa Casey reports.
DOI:10.1049/tpe.1987.0029
出版商:IEE
年代:1987
数据来源: IET
|
4. |
Planning a communications system |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 21-24
Preview
|
PDF (845KB)
|
|
摘要:
One of the many important considerations in the design and implementation of a computer integrated factory is data communications. It has a great potential effect on the efficiency of any system and its introduction must, therefore, be planned properly. Cheng Leong Ang, lecturer at the Department of Engineering, Ngee Ann Polytechnic, Singapore, describes the steps involved.
DOI:10.1049/tpe.1987.0030
出版商:IEE
年代:1987
数据来源: IET
|
5. |
Link adopts FMS approach for plastics |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 26-27
Preview
|
PDF (525KB)
|
|
摘要:
When Link 51's plastics division decided to concentrate less on in-house production and more on contract work, it realised it would need the flexibility to adapt to change and the ability to produce components ‘right first time’. To this end, the firm is operating on a just-in-time basis, which has meant a move to flexible manufacturing methods, as Rory Baxter reports.
DOI:10.1049/tpe.1987.0031
出版商:IEE
年代:1987
数据来源: IET
|
6. |
Integration software—key to CIM |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 29-31
Preview
|
PDF (596KB)
|
|
摘要:
The third in a series of papers examining aspects of computer integrated manufacturing (CIM). This month Roger Beach, student member, Adrian Davy, student member, Dr Tom Littlefield, and Bernard O'Toole FIProdE of Leeds Polytechnic's Manufacturing Systems Engineering Department examine the problems of integrating computer hardware and software.
DOI:10.1049/tpe.1987.0032
出版商:IEE
年代:1987
数据来源: IET
|
7. |
The secrets of success |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 41-42
Preview
|
PDF (475KB)
|
|
摘要:
Many factors must be taken into account when designing viable products for today's marketplace. Here, we follow the progress of two new innovations from the design stage through to manufacture.
DOI:10.1049/tpe.1987.0034
出版商:IEE
年代:1987
数据来源: IET
|
8. |
The cost of last minute changes |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 44-45
Preview
|
PDF (378KB)
|
|
摘要:
Decisions taken at the design engineering phase effectively commit the remaining detail and manufacturing costs. Here, we look at how the use of mechanical computer aided engineering (MCAE) technology in designing for manufacture can significantly improve quality and reduce production costs.
DOI:10.1049/tpe.1987.0035
出版商:IEE
年代:1987
数据来源: IET
|
9. |
Training for design |
|
Production Engineer,
Volume 66,
Issue 2,
1987,
Page 45-46
Preview
|
PDF (545KB)
|
|
摘要:
In 1966 Dr Cosby Smallpeice decided to set up a Trust with the specific aim of spreading the message of his design for production philosophy. Two decades on the Trust has assets worth some £6M. Anne Powell went along to its headquarters in Leamington Spa to find out just what type of service was on offer.
DOI:10.1049/tpe.1987.0036
出版商:IEE
年代:1987
数据来源: IET
|