1. |
A little bit of glasnost goes a long way |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 6-7
Preview
|
PDF (756KB)
|
|
DOI:10.1049/tpe.1988.0073
出版商:IEE
年代:1988
数据来源: IET
|
2. |
Technology at work |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 12-13
Preview
|
PDF (2361KB)
|
|
DOI:10.1049/tpe.1988.0078
出版商:IEE
年代:1988
数据来源: IET
|
3. |
Letter from Germany: Company town |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 17-17
ThomasMoriarty,
Preview
|
PDF (183KB)
|
|
摘要:
Our third report by Thomas Moriarty from inside a West German training school.
DOI:10.1049/tpe.1988.0083
出版商:IEE
年代:1988
数据来源: IET
|
4. |
Focal point scheduling—a study at sheerness steel |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 19-23
JohnSampson,
Preview
|
PDF (877KB)
|
|
DOI:10.1049/tpe.1988.0084
出版商:IEE
年代:1988
数据来源: IET
|
5. |
Austin rover's speech based quality assurance system |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 24-27
Kapul D.Gill,
Preview
|
PDF (777KB)
|
|
DOI:10.1049/tpe.1988.0085
出版商:IEE
年代:1988
数据来源: IET
|
6. |
Automating injection moulding—some economic considerations |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 29-31
Douglas C.Hall,
Preview
|
PDF (709KB)
|
|
DOI:10.1049/tpe.1988.0086
出版商:IEE
年代:1988
数据来源: IET
|
7. |
The preview—final instalment |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 33-39
Preview
|
PDF (1240KB)
|
|
DOI:10.1049/tpe.1988.0087
出版商:IEE
年代:1988
数据来源: IET
|
8. |
£1 million cell brings pipe-fittings in-house |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 43-43
Preview
|
PDF (275KB)
|
|
DOI:10.1049/tpe.1988.0088
出版商:IEE
年代:1988
数据来源: IET
|
9. |
We have touchdown |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 45-47
Preview
|
PDF (530KB)
|
|
DOI:10.1049/tpe.1988.0089
出版商:IEE
年代:1988
数据来源: IET
|
10. |
Condition monitoring—towards total machine management |
|
Production Engineer,
Volume 67,
Issue 4,
1988,
Page 49-50
DerekWest,
Preview
|
PDF (851KB)
|
|
DOI:10.1049/tpe.1988.0090
出版商:IEE
年代:1988
数据来源: IET
|