1. |
Diamond tooling cuts into camera costs and ups tool life |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 13-15
Preview
|
PDF (2476KB)
|
|
DOI:10.1049/tpe.1983.0074
出版商:IEE
年代:1983
数据来源: IET
|
2. |
Automatic press line gives flexibility to philips tumble dryer manufacture |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 17-18
Preview
|
PDF (829KB)
|
|
DOI:10.1049/tpe.1983.0075
出版商:IEE
年代:1983
数据来源: IET
|
3. |
How education has failed so many engineers |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 21-22
Preview
|
PDF (814KB)
|
|
DOI:10.1049/tpe.1983.0076
出版商:IEE
年代:1983
数据来源: IET
|
4. |
Searching for the universal programming language |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 24-25
Preview
|
PDF (1128KB)
|
|
DOI:10.1049/tpe.1983.0077
出版商:IEE
年代:1983
数据来源: IET
|
5. |
The Mandelli approach to controls |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 25-26
Preview
|
PDF (711KB)
|
|
DOI:10.1049/tpe.1983.0078
出版商:IEE
年代:1983
数据来源: IET
|
6. |
Renault's FMS success |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 27-28
Preview
|
PDF (1270KB)
|
|
DOI:10.1049/tpe.1983.0079
出版商:IEE
年代:1983
数据来源: IET
|
7. |
Design for production is the aim of a new graphics NC programmer |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 29-29
Preview
|
PDF (504KB)
|
|
DOI:10.1049/tpe.1983.0080
出版商:IEE
年代:1983
数据来源: IET
|
8. |
How to be competitive—NE 83 leads the way |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 33-35
Preview
|
PDF (1242KB)
|
|
DOI:10.1049/tpe.1983.0081
出版商:IEE
年代:1983
数据来源: IET
|
9. |
Ne 83 floorplans |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 36-38
Preview
|
PDF (603KB)
|
|
DOI:10.1049/tpe.1983.0082
出版商:IEE
年代:1983
数据来源: IET
|
10. |
Productivity up 30%—and not a robot in sight! |
|
Production Engineer,
Volume 62,
Issue 4,
1983,
Page 43-44
Preview
|
PDF (683KB)
|
|
DOI:10.1049/tpe.1983.0083
出版商:IEE
年代:1983
数据来源: IET
|