1. |
Why EDM is expanding from the toolroom on to the shopfloor |
|
Production Engineer,
Volume 59,
Issue 1,
1980,
Page 19-24
JohnCrookall,
TrevorShaw,
Preview
|
PDF (1491KB)
|
|
DOI:10.1049/tpe.1980.0014
出版商:IEE
年代:1980
数据来源: IET
|
2. |
EDM flexibility revolutionises subcontract work |
|
Production Engineer,
Volume 59,
Issue 1,
1980,
Page 25-28
Preview
|
PDF (534KB)
|
|
DOI:10.1049/tpe.1980.0015
出版商:IEE
年代:1980
数据来源: IET
|
3. |
How one company uses EDM to simplify the art of diemaking |
|
Production Engineer,
Volume 59,
Issue 1,
1980,
Page 29-29
Preview
|
PDF (317KB)
|
|
DOI:10.1049/tpe.1980.0016
出版商:IEE
年代:1980
数据来源: IET
|
4. |
Making the MOST of work measurement |
|
Production Engineer,
Volume 59,
Issue 1,
1980,
Page 49-51
Preview
|
PDF (1106KB)
|
|
DOI:10.1049/tpe.1980.0017
出版商:IEE
年代:1980
数据来源: IET
|
5. |
Shopfloor controls—can they be standardised |
|
Production Engineer,
Volume 59,
Issue 1,
1980,
Page 55-56
Preview
|
PDF (748KB)
|
|
DOI:10.1049/tpe.1980.0018
出版商:IEE
年代:1980
数据来源: IET
|
6. |
‘There is no more important than the production engineer’ |
|
Production Engineer,
Volume 59,
Issue 1,
1980,
Page 60-62
Preview
|
PDF (893KB)
|
|
DOI:10.1049/tpe.1980.0019
出版商:IEE
年代:1980
数据来源: IET
|