1. |
Behind the iron curtain, but not behind the door! |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 8-9
RoryBaxter,
Preview
|
PDF (589KB)
|
|
DOI:10.1049/tpe.1984.0160
出版商:IEE
年代:1984
数据来源: IET
|
2. |
Metal forming firms must invest in new technology |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 11-13
D JWilliams,
EAppleton,
Preview
|
PDF (837KB)
|
|
DOI:10.1049/tpe.1984.0161
出版商:IEE
年代:1984
数据来源: IET
|
3. |
What does a CAPM system consist of? |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 15-16
TimSouthern,
Preview
|
PDF (760KB)
|
|
DOI:10.1049/tpe.1984.0162
出版商:IEE
年代:1984
数据来源: IET
|
4. |
More haste, less speed when making system selection |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 17-18
JoeReeve,
Preview
|
PDF (1630KB)
|
|
DOI:10.1049/tpe.1984.0163
出版商:IEE
年代:1984
数据来源: IET
|
5. |
Micross production control improves Carville efficiency |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 20-21
DuncanHolland,
Preview
|
PDF (561KB)
|
|
摘要:
While not making headline grabbing claims for dramatic savings in productivity and delivery times, Carville has quietly got on with the task of improving the efficiency of production management in its plastic and Perspex component shop-floor. Duncan Holland visited the company which was the first to install a Kewill Micross system and which now enjoys the benefits of a well ordered manufacturing schedule.
DOI:10.1049/tpe.1984.0164
出版商:IEE
年代:1984
数据来源: IET
|
6. |
‘Flexible’ system makes pet food production easy |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 23-24
StephenMargolis,
Preview
|
PDF (774KB)
|
|
DOI:10.1049/tpe.1984.0165
出版商:IEE
年代:1984
数据来源: IET
|
7. |
‘CAPM is the future of UK industry’ |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 26-27
PhilClark,
Preview
|
PDF (609KB)
|
|
DOI:10.1049/tpe.1984.0166
出版商:IEE
年代:1984
数据来源: IET
|
8. |
Control package ‘gives production engineer freedom’ |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 29-30
RoryBaxter,
Preview
|
PDF (1262KB)
|
|
DOI:10.1049/tpe.1984.0167
出版商:IEE
年代:1984
数据来源: IET
|
9. |
The IProdE and CAPM |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 30-30
Preview
|
PDF (876KB)
|
|
DOI:10.1049/tpe.1984.0168
出版商:IEE
年代:1984
数据来源: IET
|
10. |
How copics helped KTM grow in ‘a harsh environment’ |
|
Production Engineer,
Volume 63,
Issue 8,
1984,
Page 32-33
RoryBaxter,
Preview
|
PDF (1055KB)
|
|
DOI:10.1049/tpe.1984.0169
出版商:IEE
年代:1984
数据来源: IET
|