| 1. |
Heavy spending on advanced machinery gives subcontractors flexibility and speed |
| |
Production Engineer,
Volume 62,
Issue 2,
1983,
Page 17-18
Preview
|
PDF (772KB)
|
|
DOI:10.1049/tpe.1983.0036
出版商:IEE
年代:1983
数据来源: IET
|
| 2. |
How risking failure guaranteed success for harkers |
| |
Production Engineer,
Volume 62,
Issue 2,
1983,
Page 19-21
Preview
|
PDF (1359KB)
|
|
DOI:10.1049/tpe.1983.0037
出版商:IEE
年代:1983
数据来源: IET
|
| 3. |
Manufacturers will cut investment by using subcontractors |
| |
Production Engineer,
Volume 62,
Issue 2,
1983,
Page 25-26
Preview
|
PDF (1091KB)
|
|
DOI:10.1049/tpe.1983.0038
出版商:IEE
年代:1983
数据来源: IET
|
| 4. |
Why investing is vital to subcontractors |
| |
Production Engineer,
Volume 62,
Issue 2,
1983,
Page 29-31
Preview
|
PDF (1224KB)
|
|
DOI:10.1049/tpe.1983.0039
出版商:IEE
年代:1983
数据来源: IET
|
| 5. |
Design for production and cut secondary machining |
| |
Production Engineer,
Volume 62,
Issue 2,
1983,
Page 32-33
Preview
|
PDF (1219KB)
|
|
DOI:10.1049/tpe.1983.0040
出版商:IEE
年代:1983
数据来源: IET
|
| 6. |
New manufacturing methods—why the uk lags behind |
| |
Production Engineer,
Volume 62,
Issue 2,
1983,
Page 38-38
Preview
|
PDF (671KB)
|
|
DOI:10.1049/tpe.1983.0041
出版商:IEE
年代:1983
数据来源: IET
|
| 7. |
Handling system—the heart of FMS |
| |
Production Engineer,
Volume 62,
Issue 2,
1983,
Page 40-42
Preview
|
PDF (1281KB)
|
|
DOI:10.1049/tpe.1983.0042
出版商:IEE
年代:1983
数据来源: IET
|
| 8. |
The Japanese way to better productivity and improved quality |
| |
Production Engineer,
Volume 62,
Issue 2,
1983,
Page 44-46
Preview
|
PDF (1645KB)
|
|
DOI:10.1049/tpe.1983.0043
出版商:IEE
年代:1983
数据来源: IET
|