|
1. |
The production smoothing problem |
|
Production Engineer,
Volume 51,
Issue 4,
1972,
Page 123-129
S.Eilon,
Preview
|
PDF (1105KB)
|
|
DOI:10.1049/tpe.1972.0016
出版商:IEE
年代:1972
数据来源: IET
|
2. |
A survey of work measurement techniques |
|
Production Engineer,
Volume 51,
Issue 4,
1972,
Page 130-134
W.A.Woeber,
Preview
|
PDF (819KB)
|
|
DOI:10.1049/tpe.1972.0017
出版商:IEE
年代:1972
数据来源: IET
|
3. |
Craft training by the module system |
|
Production Engineer,
Volume 51,
Issue 4,
1972,
Page 135-137
R.Dennett,
Preview
|
PDF (550KB)
|
|
DOI:10.1049/tpe.1972.0019
出版商:IEE
年代:1972
数据来源: IET
|
|